The LIFE PLASMIX project develops two of its stages, outside the Ecocentral, located in the Marchalhendín industrial estate.
Both the warehouse where the equipment will be located and the office building are being built in the polygon.
As of today, January 4, 2021, all the pillars that make up the entire structure have already been placed, being a great advance, so that the LIFE PLASMIX project can be fully implemented.