Completion of the metal structure for the water treatment equipment required for stage 2 of the project, the washing stage.

The structure has a length of 23.5 metres and a width of 5.5 metres, distributed over two floors, with a total height of 7.8 metres.

This structure will house all the equipment that makes up the water treatment plant, both from the LIFE 4 FILM project and LIFE PLASMIX, both being symmetrical.

The water is purified, cleaned and reused again, thanks to its semi-closed circuit system, which is also beneficial for the environment.